16.2kWp Grid-Tie Solar System
Location: New Amsterdam, berbice
Surface Area: m2
Year Complete: 2023
Green Power Solutions Inc. (GPSI.) has designed, supplied & installed this 16.2kWp PV Grid-Tie Solar System in New Amsterdam, Berbice, for a residential customer, showcasing their dedication to sustainable energy solutions.
This system includes 36 450W solar panels and 2 Fronius Primo 7.6-1 7.6kW 240-208VAC Grid Tie inverters, configured for optimal performance.
With a 6-month installation warranty provided by GPSI., the client enjoys peace of mind. Additionally, the equipment warranty ranges from 10 years to 25 years, ensuring long-term reliability and customer satisfaction.
Monitoring via the Fronius online portal enables seamless tracking of system performance for both the client and Green Power Solutions Inc.