22.8 kwp PV Grid-Tie Solar System

Client:
Location:15 Strand New Amsterdam Berbice,
Guyana
Surface Area:m2
Year Complete:2019
Value:$
Supervising Engineer:

Green Power Solutions Inc. designed, supplied, installed and commissioned this 22.8 kWp PV Grid-Tie Solar System at 15 strand New Amsterdam Berbice, Guyana. This system was installed to reduce their monthly electricity cost and improve services.

Visit Our Office : Lot 1 Tain Corentyne Berbice, Guyana, South America

Mon to Sat

8:00am - 5:00pm

(©) 2024 Green Power Solutions Inc. All Rights Reserved. Designed by WEBWIDEIT