10.3 kWp Grid-Tie System
Location: Corentyne, Berbice, Guyana.
Surface Area: m2
Year Complete: 2017
This 10.3kWp Grid-Tie System designed and installed by Green Power Solutions Inc to meet the needs of the client.
Location: Corentyne, Berbice, Guyana.
Surface Area: m2
Year Complete: 2017
This 10.3kWp Grid-Tie System designed and installed by Green Power Solutions Inc to meet the needs of the client.