2.07 kWp Off-Grid System

Client:

Location: Linden-Soesdyke Highway

Surface Area: m2 

Year Complete: 2019

Value:

Supervising Engineer:

This 2.07 kWp Off-Grid System was installed in an area where there is no electricity. The system was designed with a 5.6 kWh battery bank to cater to the client’s need.

Visit Our Office : Lot 1 Tain Corentyne Berbice, Guyana, South America

Mon to Sat

8:00am - 5:00pm

(©) 2024 Green Power Solutions Inc. All Rights Reserved.