22.8 kwp PV Grid-Tie Solar System
Client:
Location: 15 Strand New Amsterdam Berbice, Guyana
Surface Area: m2
Year Complete: 2019
Value: $
Supervising Engineer:
Green Power Solutions Inc. designed, supplied, installed and commissioned this 22.8 kWp PV Grid-Tie Solar System at 15 strand New Amsterdam Berbice, Guyana. This system was installed to reduce their monthly electricity cost and improve services.