4 kW Solar Power System in N/A Corentyne Berbice Guyana

Client:

Location: New Amsterdam

Surface Area: m2 

Year Complete: 2017

Value:

Supervising Engineer:

A grid tie system for a customer in New Amsterdam Corentyne Berbice Guyana

Costumers Wishes

The customer wishes to reduce their dependency on the national grid. The customer’s energy demands were assessed to determine the maximum power usage and a design was made to fit this need.

Visit Our Office : Lot 1 Tain Corentyne Berbice, Guyana, South America

Mon to Sat

8:00am - 5:00pm

(©) 2024 Green Power Solutions Inc. All Rights Reserved.