10.3 kWp Grid-Tie System

Location: Corentyne, Berbice, Guyana.

Surface Area: m2 

Year Complete: 2017

This 10.3kWp Grid-Tie System designed and installed by Green Power Solutions Inc to meet the needs of the client.

Visit Our Office : Lot 1 Tain Corentyne Berbice, Guyana, South America

Mon to Sat

8:00am - 5:00pm

(©) 2024 Green Power Solutions Inc. All Rights Reserved.