8.6kW Grid-Tie Solar System

Location: New Amsterdam, Corentyne Berbice, Guyana

Surface Area: m2 

Year Complete: 2017

Green Power Solutions Inc. spearheaded the design, supply, and installation of an 8.6 kW Grid-tie solar system at a funeral home in New Amsterdam, Berbice. This innovative system seamlessly integrates with the local power grid, effortlessly channeling excess solar energy generated during daylight hours back into the grid. Embracing solar power not only diminishes the funeral home's carbon footprint but also champions a greener approach to energy consumption. This proactive initiative not only yields cost savings for the funeral home but also propels the wider embrace of renewable energy solutions within the community.

Visit Our Office : Lot 1 Tain Corentyne Berbice, Guyana, South America

Mon to Sat

8:00am - 5:00pm

(©) 2024 Green Power Solutions Inc. All Rights Reserved.